PIEC fabrication facility

Vendor Approval RDSO

Information displayed for customers in line with Para-8 requirements for approved steel girder fabrication vendors.

Source note: This page uses the filled Para-8 information request and the supporting statutory, certification, approval, and facility documents supplied to PIEC Projects Private Limited.
Legal Name PIEC Projects Private Limited
CIN U25920CT2025PTC018013
RDSO Approval IREPS ID 1130832
ISO Certification ISO 9001:2015

Ownership Details

OwnershipPrivate Limited Company
Board of DirectorsMr. Harshdeep Gupta and Mrs. Sunita Gupta
IncorporationCIN U25920CT2025PTC018013, incorporated on 09/05/2025 under the Ministry of Corporate Affairs.
Memorandum and ArticlesMemorandum of Association and Articles of Association are available in the downloads section.
Registered Address139 C & F, Light Industrial Area, Bhilai - 490026, Chhattisgarh.
Contactpec.marketing@pecventures.com, harshdeep.gupta@pecventures.com, +91 93022 04796

Fabrication Unit Details

UnitM/s. PIEC Projects Pvt. Ltd., 139 C & F, Light Industrial Area, Bhilai - 490026, Chhattisgarh.
Plot Area1.30 acre
Covered Area1.00 acre
Office Area0.114 acre
Crane Capacity20 MT and 5 MT EOT cranes
Hydra15 MT, 2 nos.

Facilities, Shops, and Machinery

Area Details
Template layout area10 m x 45 m
Fabrication shopCutting: CNC Plasma Cutting Machine (Max Pro - 200). Drilling: CNC Drilling Machine. Welding: Automatic Submerged Arc Welding Machine. Straightening and end milling available.
Blasting shop15 m x 6 m covered blasting shed. Compressor 40 HP, 2 nos., with tank, hopper, rubber hose pipe, blasting nozzle, and accessories.
Metalizing and painting shop22 m x 6 m covered shed. Compressor 30 HP, 2 nos., airless painting machine, cup gun, metalizing gun, flow meter, hose pipes with regulators, and elcometers.
Assembly area21 m x 46 m open area.
Stacking area8 m x 40 m open area.
Other facility / area / shopNot applicable as per supplied filled checklist.

Machinery and Plant

DG Set 63 kVA - Mahindra DG Set 10 kVA - Kirloskar Welding transformers - 7 nos. MIG machines - 6 nos. Magnet drill machines - 10 nos. AG-7 grinders - 14 nos. AG-5 grinders - 5 nos. AG-4 grinders - 5 nos. Backing ovens - 2 nos. Hydraulic jacks with pump, 100 MT - 20 nos. Electric winch, 200 MT - 1 no. Manual winch, 10 MT - 1 no. Plate bending machine up to 20 mm - 1 no. Torque wrenches - 2 nos. Stud welding machine - Weldkon WKN-25 Hand cutting torch - 10 sets Bench grinders - 2 nos. Measuring and fabrication hand tools

RDSO Approval Details

Approval ReferenceCBS/G/Reg./PIEC dated 07/01/2026
Original Registration ReferenceCBS/G/Reg./Precision dated 23/09/2023
Approved ItemFabrication of open web, composite girder, and other steel plate girder, Part - A.
IREPS Registration ID1130832
Annual Production Capacity3000 - 3500 MT
Last Quality Audit23/09/2023
Next Quality Audit Due24/09/2026
Approval LetterAvailable in the downloads section.

Company and Statutory Registration

Companies Act RegistrationCIN U25920CT2025PTC018013, registration date 09/05/2025, ROC/location: 139 C&F, Light Industrial Area, Bhilai.
MSME / UdyamUDYAM-CG-05-0061018, category: Micro, dated 02/08/2025.
Factory LicenseLicense No. 15057/15057/G-FAB/DRG/2m(i), Government of Chhattisgarh.
GSTGST registration certificate available in downloads.
Pollution ConsentPollution certificate available in downloads.
LayoutPIEC Projects layout drawing available in downloads.

ISO 9001 Certification

StandardISO 9001:2015, Quality Management System
Certifying BodyGlobal Standards
Certificate Number090612AO01PI
Certificate Since15/12/2025
Certificate Issue Date15/12/2025
Next Audit Due14/12/2026
First Surveillance Due14/12/2026
Second Surveillance Due14/12/2027
Valid Until14/12/2028
ScopeFabrication and launching of steel bridge girders and H-Beam sleepers for railway applications, and steel fabrication/manufacturing of specialized engineering equipment for the industrial sector.

Organisation Chart

PIEC organization chart showing the directors, technical and commercial leadership, and connected quality, planning, production, stores, human resources, finance, purchasing, dispatch, and logistics roles.
PIEC organization chart

Testing Facilities

Testing area Mode and details
Physical testingOutsourced to M/s. Shabri Enterprises, NABL accredited lab.
Chemical testingOutsourced to M/s. Shabri Enterprises, NABL accredited lab.
Mechanical testingOutsourced to M/s. Shabri Enterprises, NABL accredited lab.
DPTIn-house, as per approved QAP. Equipment: DPT kit. Vendor/brand: Superon.
UTPA / UT / RTOutsourced to M/s. Shabri Enterprises, NABL accredited lab.

Mandatory Approvals

NABLCertificate number TC-5642
AERBCertificate number 21-IRRERA-661454
ASNTCertificate number 25-IRLOP-1347147
Other approvals / clientsKRCL, CEIL, RVNL, South East Central Railway, L&T.

Artisan Details

Function Name Qualification Experience Certification / Training
CNC CuttingMr. Nitesh Kumar SahuGraduate8 Years-
CNC DrillingMr. Kisan Mahto12th Pass10 Years-
SAW WeldingMr. Dheeraj Shah12th Pass15 YearsWRI, Trichy Certified
GMAW WeldingMr. Dev Kumar Sahu10th Pass20 YearsWRI, Trichy Certified
BlastingMr. Saroj Sahani10th Pass12 Years-
MetalizingMr. Raja SahGraduate12 Years-
PaintingMr. Arvind Sah10th Pass8 Years-

Power Demand and Installed Supply

Power Demand / Tariff CategoryLV5200T225
Installed Power Supply200 HP
Sanctioned LoadAbove 150 HP
Backup PowerDiesel Generator 63 kVA, battery inverter 10 kW UPS.

Executed Works / Supplies - Last 5 Years

Sl. No. Description of Work Qty. in MT Amount in Rs. Status
1Rail Vikas Nigam Limited - Raipur: Supply, fabrication, and launching of 30.5 m steel open web girders for Bridge No. 77 (Mahanadi River) for the Raipur - Titlagarh doubling project. 11 spans of OWG, channel sleepers, trolley refuge, man pathway, and gang pathway.900 (11 spans)11,58,21,481/-Works Completed
2Rail Vikas Nigam Limited - Mumbai: Supply, fabrication, and launching of balance work for construction of the 2nd FOB at Gulbarga Station in connection with doubling of the Hotgi - Gulbarga section.134 (2 spans)1,81,69,102/-Works Completed
3Bangalore Metro through ITD CEMINDIA JV: Fabrication and erection of structural steel girder superstructures for Reach R5, Package 1, Phase 2. Composite girders supplied: 1 span x 32 m and 1 span x 50 m.460 (2 spans)1,84,00,000/-Works Completed
4Rail Vikas Nigam Limited - Kota: Construction of foot over bridges at Sogaria and Bhonra Stations in connection with the Sogaria - Bhonra section of the Kota - Bina doubling project. 2 FOBs and 1 ramp.346 (2 FOBs)4,32,08,660/-Works Completed
5Rail Vikas Nigam Limited - Pune: Fabrication, erection, and launching of 7 spans of 18.3 m plate girder including metalizing, H-beam sleeper, pathway, trolley refuges, chequered plate, and bearing for Bridge No. 326/1 between Washimbe and Pophlaj Station.196 (7 spans)2,92,07,289/-Works Completed
6Rail Vikas Nigam Limited - Pune: Fabrication, erection, and launching of 6 spans of 30.5 m open web under-slung girder for Bridge Nos. 315/1 and 317/3 between Washimbe and Jinti Road Station, including metalizing, H-beam sleepers, pathways, trolley refuges, chequered plate, and bearings.430 (6 spans)12,92,02,938/-Works Completed
7Bangalore Metro through ITD CEMINDIA JV: Design, fabrication, surface preparation, metalizing, and painting of open web steel girder superstructure between BP25-26 over railway span.5302,47,03,300/-Works Completed
8Export order of AFCONS - KPTL JV, Dhaka, for Bangladesh Railway: Steel superstructure girders and FOBs for the Dhaka - Tongi and Tongi - Joydebpur sections. Bridge No. 47: 1 x 27.2 m and 2 x 16.4 m. Bridge No. 42: 12 x 19.8 m and 4 x 40.0 m.1750.10421,13,13,232/-Works Completed
9Southern Railway, Palakkad Division: Fabrication and supply of 5 double-I-section temporary girders of 26.80 m overall length to RDSO B 11042 for reconstruction of existing RUB No. 528 between Madukkarai and Palakkad stations. 5 spans of RH girder.353.3825,37,18,082/-Works Completed
10Northern Railway through Kalpataru Projects International Limited: Supplying and fabrication of open web girders of 45.7 m and 61.0 m as per RDSO drawings RDSO/B/17181/R and RDSO/B/17182/R for construction and commissioning of Chandigarh - Baddi. 1 span x 45.7 m and 1 span x 61.0 m.371.9255,04,07,521/-Works Completed
11Northern Railway through R S Sharma Contractors Private Limited: Construction of a 4-lane road over bridge at the shifted location between Km 31/27-29 in lieu of LC No. 7-C/E-2, on a 45 m wide road in the Madhuban Bapudham Scheme of Ghaziabad Development Authority. 2 spans of bow string girder, each 42.0 m.8422,10,00,000/-Works Completed

Works In Hand

Sl. No. Description of Work Qty. in MT Amount in Rs. Status
1Northern Railway through Kalpataru Projects International Limited: Supplying, fabrication, and erection of composite steel girders of 12.20 m, 18.30 m, and 24.40 m as per standard RDSO drawings or approved KPIL drawings at the project site for construction and commissioning of Chandigarh - Baddi.500055,85,82,500/-Under Execution
2Northern Railway through Kalpataru Projects International Limited: Design of fabrication drawing and launching scheme for steel girder for Mukerian - Talwara section in connection with the NLDM - TLR - MEX new broad-gauge line, RUB No. 2, 4 spans x 25.2 m semi-through girder at CH 3395.30.6507,15,00,000/-Under Execution