Source note: This page uses the filled Para-8 information request and the supporting statutory, certification, approval, and facility documents supplied to PIEC Projects Private Limited.
Ownership Details
OwnershipPrivate Limited Company
Board of DirectorsMr. Harshdeep Gupta and Mrs. Sunita Gupta
IncorporationCIN U25920CT2025PTC018013, incorporated on 09/05/2025 under the Ministry of Corporate Affairs.
Memorandum and ArticlesMemorandum of Association and Articles of Association are available in the downloads section.
Registered Address139 C & F, Light Industrial Area, Bhilai - 490026, Chhattisgarh.
Contactpec.marketing@pecventures.com, harshdeep.gupta@pecventures.com, +91 93022 04796
Fabrication Unit Details
UnitM/s. PIEC Projects Pvt. Ltd., 139 C & F, Light Industrial Area, Bhilai - 490026, Chhattisgarh.
Plot Area1.30 acre
Covered Area1.00 acre
Office Area0.114 acre
Crane Capacity20 MT and 5 MT EOT cranes
Hydra15 MT, 2 nos.
Facilities, Shops, and Machinery
| Area | Details |
|---|---|
| Template layout area | 10 m x 45 m |
| Fabrication shop | Cutting: CNC Plasma Cutting Machine (Max Pro - 200). Drilling: CNC Drilling Machine. Welding: Automatic Submerged Arc Welding Machine. Straightening and end milling available. |
| Blasting shop | 15 m x 6 m covered blasting shed. Compressor 40 HP, 2 nos., with tank, hopper, rubber hose pipe, blasting nozzle, and accessories. |
| Metalizing and painting shop | 22 m x 6 m covered shed. Compressor 30 HP, 2 nos., airless painting machine, cup gun, metalizing gun, flow meter, hose pipes with regulators, and elcometers. |
| Assembly area | 21 m x 46 m open area. |
| Stacking area | 8 m x 40 m open area. |
| Other facility / area / shop | Not applicable as per supplied filled checklist. |
Machinery and Plant
DG Set 63 kVA - Mahindra
DG Set 10 kVA - Kirloskar
Welding transformers - 7 nos.
MIG machines - 6 nos.
Magnet drill machines - 10 nos.
AG-7 grinders - 14 nos.
AG-5 grinders - 5 nos.
AG-4 grinders - 5 nos.
Backing ovens - 2 nos.
Hydraulic jacks with pump, 100 MT - 20 nos.
Electric winch, 200 MT - 1 no.
Manual winch, 10 MT - 1 no.
Plate bending machine up to 20 mm - 1 no.
Torque wrenches - 2 nos.
Stud welding machine - Weldkon WKN-25
Hand cutting torch - 10 sets
Bench grinders - 2 nos.
Measuring and fabrication hand tools
RDSO Approval Details
Approval ReferenceCBS/G/Reg./PIEC dated 07/01/2026
Original Registration ReferenceCBS/G/Reg./Precision dated 23/09/2023
Approved ItemFabrication of open web, composite girder, and other steel plate girder, Part - A.
IREPS Registration ID1130832
Annual Production Capacity3000 - 3500 MT
Last Quality Audit23/09/2023
Next Quality Audit Due24/09/2026
Approval LetterAvailable in the downloads section.
Company and Statutory Registration
Companies Act RegistrationCIN U25920CT2025PTC018013, registration date 09/05/2025, ROC/location: 139 C&F, Light Industrial Area, Bhilai.
MSME / UdyamUDYAM-CG-05-0061018, category: Micro, dated 02/08/2025.
Factory LicenseLicense No. 15057/15057/G-FAB/DRG/2m(i), Government of Chhattisgarh.
GSTGST registration certificate available in downloads.
Pollution ConsentPollution certificate available in downloads.
LayoutPIEC Projects layout drawing available in downloads.
ISO 9001 Certification
StandardISO 9001:2015, Quality Management System
Certifying BodyGlobal Standards
Certificate Number090612AO01PI
Certificate Since15/12/2025
Certificate Issue Date15/12/2025
Next Audit Due14/12/2026
First Surveillance Due14/12/2026
Second Surveillance Due14/12/2027
Valid Until14/12/2028
ScopeFabrication and launching of steel bridge girders and H-Beam sleepers for railway applications, and steel fabrication/manufacturing of specialized engineering equipment for the industrial sector.
Organisation Chart
Testing Facilities
| Testing area | Mode and details |
|---|---|
| Physical testing | Outsourced to M/s. Shabri Enterprises, NABL accredited lab. |
| Chemical testing | Outsourced to M/s. Shabri Enterprises, NABL accredited lab. |
| Mechanical testing | Outsourced to M/s. Shabri Enterprises, NABL accredited lab. |
| DPT | In-house, as per approved QAP. Equipment: DPT kit. Vendor/brand: Superon. |
| UTPA / UT / RT | Outsourced to M/s. Shabri Enterprises, NABL accredited lab. |
Mandatory Approvals
NABLCertificate number TC-5642
AERBCertificate number 21-IRRERA-661454
ASNTCertificate number 25-IRLOP-1347147
Other approvals / clientsKRCL, CEIL, RVNL, South East Central Railway, L&T.
Artisan Details
| Function | Name | Qualification | Experience | Certification / Training |
|---|---|---|---|---|
| CNC Cutting | Mr. Nitesh Kumar Sahu | Graduate | 8 Years | - |
| CNC Drilling | Mr. Kisan Mahto | 12th Pass | 10 Years | - |
| SAW Welding | Mr. Dheeraj Shah | 12th Pass | 15 Years | WRI, Trichy Certified |
| GMAW Welding | Mr. Dev Kumar Sahu | 10th Pass | 20 Years | WRI, Trichy Certified |
| Blasting | Mr. Saroj Sahani | 10th Pass | 12 Years | - |
| Metalizing | Mr. Raja Sah | Graduate | 12 Years | - |
| Painting | Mr. Arvind Sah | 10th Pass | 8 Years | - |
Power Demand and Installed Supply
Power Demand / Tariff CategoryLV5200T225
Installed Power Supply200 HP
Sanctioned LoadAbove 150 HP
Backup PowerDiesel Generator 63 kVA, battery inverter 10 kW UPS.
Executed Works / Supplies - Last 5 Years
| Sl. No. | Description of Work | Qty. in MT | Amount in Rs. | Status |
|---|---|---|---|---|
| 1 | Rail Vikas Nigam Limited - Raipur: Supply, fabrication, and launching of 30.5 m steel open web girders for Bridge No. 77 (Mahanadi River) for the Raipur - Titlagarh doubling project. 11 spans of OWG, channel sleepers, trolley refuge, man pathway, and gang pathway. | 900 (11 spans) | 11,58,21,481/- | Works Completed |
| 2 | Rail Vikas Nigam Limited - Mumbai: Supply, fabrication, and launching of balance work for construction of the 2nd FOB at Gulbarga Station in connection with doubling of the Hotgi - Gulbarga section. | 134 (2 spans) | 1,81,69,102/- | Works Completed |
| 3 | Bangalore Metro through ITD CEMINDIA JV: Fabrication and erection of structural steel girder superstructures for Reach R5, Package 1, Phase 2. Composite girders supplied: 1 span x 32 m and 1 span x 50 m. | 460 (2 spans) | 1,84,00,000/- | Works Completed |
| 4 | Rail Vikas Nigam Limited - Kota: Construction of foot over bridges at Sogaria and Bhonra Stations in connection with the Sogaria - Bhonra section of the Kota - Bina doubling project. 2 FOBs and 1 ramp. | 346 (2 FOBs) | 4,32,08,660/- | Works Completed |
| 5 | Rail Vikas Nigam Limited - Pune: Fabrication, erection, and launching of 7 spans of 18.3 m plate girder including metalizing, H-beam sleeper, pathway, trolley refuges, chequered plate, and bearing for Bridge No. 326/1 between Washimbe and Pophlaj Station. | 196 (7 spans) | 2,92,07,289/- | Works Completed |
| 6 | Rail Vikas Nigam Limited - Pune: Fabrication, erection, and launching of 6 spans of 30.5 m open web under-slung girder for Bridge Nos. 315/1 and 317/3 between Washimbe and Jinti Road Station, including metalizing, H-beam sleepers, pathways, trolley refuges, chequered plate, and bearings. | 430 (6 spans) | 12,92,02,938/- | Works Completed |
| 7 | Bangalore Metro through ITD CEMINDIA JV: Design, fabrication, surface preparation, metalizing, and painting of open web steel girder superstructure between BP25-26 over railway span. | 530 | 2,47,03,300/- | Works Completed |
| 8 | Export order of AFCONS - KPTL JV, Dhaka, for Bangladesh Railway: Steel superstructure girders and FOBs for the Dhaka - Tongi and Tongi - Joydebpur sections. Bridge No. 47: 1 x 27.2 m and 2 x 16.4 m. Bridge No. 42: 12 x 19.8 m and 4 x 40.0 m. | 1750.104 | 21,13,13,232/- | Works Completed |
| 9 | Southern Railway, Palakkad Division: Fabrication and supply of 5 double-I-section temporary girders of 26.80 m overall length to RDSO B 11042 for reconstruction of existing RUB No. 528 between Madukkarai and Palakkad stations. 5 spans of RH girder. | 353.382 | 5,37,18,082/- | Works Completed |
| 10 | Northern Railway through Kalpataru Projects International Limited: Supplying and fabrication of open web girders of 45.7 m and 61.0 m as per RDSO drawings RDSO/B/17181/R and RDSO/B/17182/R for construction and commissioning of Chandigarh - Baddi. 1 span x 45.7 m and 1 span x 61.0 m. | 371.925 | 5,04,07,521/- | Works Completed |
| 11 | Northern Railway through R S Sharma Contractors Private Limited: Construction of a 4-lane road over bridge at the shifted location between Km 31/27-29 in lieu of LC No. 7-C/E-2, on a 45 m wide road in the Madhuban Bapudham Scheme of Ghaziabad Development Authority. 2 spans of bow string girder, each 42.0 m. | 842 | 2,10,00,000/- | Works Completed |
Works In Hand
| Sl. No. | Description of Work | Qty. in MT | Amount in Rs. | Status |
|---|---|---|---|---|
| 1 | Northern Railway through Kalpataru Projects International Limited: Supplying, fabrication, and erection of composite steel girders of 12.20 m, 18.30 m, and 24.40 m as per standard RDSO drawings or approved KPIL drawings at the project site for construction and commissioning of Chandigarh - Baddi. | 5000 | 55,85,82,500/- | Under Execution |
| 2 | Northern Railway through Kalpataru Projects International Limited: Design of fabrication drawing and launching scheme for steel girder for Mukerian - Talwara section in connection with the NLDM - TLR - MEX new broad-gauge line, RUB No. 2, 4 spans x 25.2 m semi-through girder at CH 3395.30. | 650 | 7,15,00,000/- | Under Execution |
Downloads
Download supporting registration, approval, certification, statutory, and facility documents.